Movement

Signing for shipbuilding contract and completing delivery - HJ Heavy Industries (formerly Hanjin Heavy Industries)

Many companies have already chosen and are satisfied with Noah SBMA.

Prototype(M.V.P)

KOMERI

Engine Testing Laboratory


• Use SBM conversion data to input viscosity data due to difficulty in installing viscosity sensors
• Development of a system linked with a conversion device for electric heaters and a viscosity sensor


KIMFT

HANWOORI


• Non-repair condition when sailing on an aged ship of more than 30 years
• Automatically adjust viscosity and normalize system with SBM introduction
• Additional installation of engine room monitor established corresponding port

Reference

STX MARINE

LOWLANDS COMFORT


Emergency Viscosity System Replacement Request for Ship Sale
• Sale of Myeongil vessel after system replacement to SBM on request day



KLC SM

SM SHANGHAI / SM SAMARINDA


• Container ship anchoring time 8 hours, give up repairing existing products
• Replacement repair completed in 6 hours with replacement system SBM.
• Reviewing SBM replacement after checking the condition of all KLCSM fleet

KLC SM

SM MUMBAI


• Replaced with the latest viscosity sensor, 8 hours
• Compatible with viscosity controller in ECR


KLC SM

OCEAN ROAD & GIANT ACE


• China dock works quickly, too
• Replace both M/E and G/E viscosity systems
• SBM 4, SCM 4, working hours 48 hours

Movement

Certificate