Close menu

Installation Cases

See how these technologies are implemented through real-world applications on actual ships.

  • Home
  • Installation Cases

Installation Cases

  • CASE STUDY

    HMM

    • Replaced NAKAKITA systems with SBM
    • System replacement: 3 hours per unit
      → 6 units on 3 vessels completed
  • CASE STUDY

    KLC SM

    • Reliability verified through 2 years of trial operation on container ships
    • 2 vessels in dock: 8 SBM units replaced
    • Replacement completed within 6 hours when existing products could not be repaired
    • Successfully stabilized 14 automatic viscosity systems to date
  • CASE STUDY

    HJ Shipbuilding & Construction

    • Commissioning completed on 4 units across 2 new container ships
    • An additional contract for 8 units on 4 vessels has been signed
      (N286/287/288/289)
    • Shipyard references have been secured
PARTNER

Our customers